2024 2025 Student Forum > Management Forum > Main Forum

 
  #2  
29th March 2013, 04:34 PM
Super Moderator
 
Join Date: May 2012
Re: Methodology MBA Project

Methodology :
Estimation of duration of each activity through analysis of records and interaction with executives of the work shop.
Drawing up of a network.
Conducting forward pass and backward pass calculations of establish the critical and sub critical activities.
The guidelines of the Methodology

Sampling: Size and coverage of the population providing data. Good sampling is done through statistical techniques. To refresh from the books mentioned at the end. Preparation of a proforma or a Questionnaire for Collection of Data: A technique that one should learn is the farming of a proper questionnaire. Most books on statistics or research methodology provide guidelines for farming a questionnaire.
Pilot study or Pre-testing: A trial run of a questionnaire or some preliminary interviews helps in finalizing the structure of the questionnaire or the interviews.

Processing of Data: Proper tabulation, classification, analysis, interpretation and comparison are essential steps in the processing of the data.
Framework for Analysis: The framework for analyzing the data will be related to your stated objectives hypothesis. Statistical method can be used for analysis where
applicable. Methodology of the project must be clearly thought out in as much detail as possible. Clarity in method helps in completing the project report expeditiously. In the box are given some illustration of methodology, both acceptable and unacceptable

you can see the more Guidelines in the below given PDF
Attached Files
File Type: pdf Methodology project Guidelines.pdf (128.0 KB, 186 views)


Quick Reply
Your Username: Click here to log in

Message:
Options




All times are GMT +5. The time now is 11:58 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
SEO by vBSEO 3.6.0 PL2

1 2 3 4