Cidco Naina Project Plan

Hi I would like to know few details of the Naina project like the specifications the interim plans as well as the approximate cost of the project to be developed by Cidco?
Similar Threads
Thread
Cidco inc CA
CIDCO Development Plan for Kharghar
Development Plan of CIDCO
Nmm cidco
CIDCO OC Feb
Rti cidco
CIDCO Sardis GA
CIDCO Virar Project
Cidco Layout Plan Ulwe Sector 9
How To Do CIDCO Transfer
CIDCO Naina Latest News
Virar CIDCO Project
CIDCO advt
CIDCO CRZ Map
Kalamboli Map CIDCO
Cidco sap
Tjsb cidco
Cidco dsr
CIDCO Ltd India
Cidco Plan Mumbai
  #2  
7th March 2016, 12:47 PM
Super Moderator
 
Join Date: Apr 2013
Re: Cidco Naina Project Plan

The Navi Mumbai Airport Influence Notified Area, or NAINA, was made after the Ministry of Environment and Forest set down 53 conditions to be met before it conceded clearances for the Navi Mumbai Airport. Among them was that Navi Mumbai's improvement arrangement must be changed to maintain a strategic distance from erratic development around the airplane terminal.

The specs

NAINA covers parts of Panvel, Pen, Uran, Karjat and Khalapur (District Raigad), including an aggregate of 270 towns and six talukas, with a range of around 561 sq km. The evaluated advancement expense is about Rs 210,000 crore. NAINA is required to have a populace of 80 lakh more than 30 years.

Interim improvement arrangement (IDP)

It is compulsory for the uncommon arranging power to set up an advancement arrangement (DP) inside of three years from the date of arrangement. Since its getting late required to set up an undeniable DP, CIDCO chose to set up a between time DP (IDP) for an a portion of NAINA.

Framework and availability

Navi Mumbai will be one of only a handful couple of areas in the nation with availability by each of the four methods of transport: air terminal, ports, streets and railroad. The Navi Mumbai Metro Rail (NMMR) is relied upon to start testing Phase I in December 2016.

Estimating and future development


Private undertaking costs at present extent from Rs 3,000 to Rs 15,000 for each sq ft for the Navi Mumbai district.


Quick Reply
Your Username: Click here to log in

Message:
Options




All times are GMT +5. The time now is 05:21 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
SEO by vBSEO 3.6.0 PL2

1 2 3 4