#1
20th January 2017, 09:42 AM
| |||
| |||
Nmm cidco
Hello sir, is there any one can provide me detail for the Navi Mumbai Metro transit system under construction by City and Industrial Development Corporation?
|
#2
20th January 2017, 10:37 AM
| |||
| |||
Re: Nmm cidco
The City and Industrial Development Corporation has a transit system under construction at Navi Mumbai for metro stations. The Navi Mumbai Metro is a rapid transit system under construction in the Indian city of Navi Mumbai, Maharashtra. The planning and construction of the Navi Mumbai Metro is being overseen by the City and Industrial Development Corporation (CIDCO). The system is planned to consist of three rail lines covering a total distance of 106.4 kilometres (66.1 mi). The foundation stone for the project was laid on 1 May 2011; following construction delays, the metro's first line is projected to open in 2017. Construction cost: Phase Termini Length Stations Cost I Belapur-Kharghar-Taloja-Pendhar 11.10 kilometres (6.90 mi) 11 ₹1,985 crore (US$290 million) II MIDC Taloja-Kalamboli–Khandeshwar (extension to Airport proposed) 10.30 kilometres (6.40 mi) 8 ₹1,509 crore (US$220 million) III Interlink between Pendhar and MIDC 2 kilometres (1.2 mi) 1 ₹574 crore (US$85 million) Total 23.40 kilometres (14.54 mi) 20 ₹4,068 crore (US$600 million) System length 23.40 km (14.54 mi) (Line 1) 106.4 km (66.1 mi) (planned) Track gauge 1,435 mm (4 ft 8 1⁄2 in) standard gauge Electrification 25 kV, 50 Hz AC through overhead catenary |
|