DMRC Phase-III Project
I want description of Phase-III Project of Delhi Metro Rail Corporation. I have done B.Tech in Electronics and Communication from IIT Delhi. Can I get job in DMRC on Phase-III Project? Provide contact details of director of Phase-III Project of DMRC whose I will give my resume to get work on that project.
|
#2
11th May 2018, 07:23 PM
| |||
| |||
Re: DMRC Phase-III Project
Hii sir, I Wants to get the Information About the MajPhase III Project of the DMRC And Also Provide me the Map of the DMRC Phase-III Project ? |
#3
11th May 2018, 07:23 PM
| |||
| |||
Re: DMRC Phase-III Project Phase III Project DMRC Phase-III includes 11 extensions to the existing lines as well as building two ring lines (Pink and Magenta lines). Phase-III has 28 underground stations, 2 new lines and 11 route extensions, totalling 167.27 km, with a cost of ₹350 billion (US$5.4 billion).[77] Phase 3 contains 3 new Lines in Delhi Metro System, Pink Line running on Inner Ring Road (Line 7), Magenta Line running on Outer Ring Road (Line 8) & Gray Line connecting Dwarka and Najafgarh (Line 09). Working on the Phase III Work on Phase III started in 2011,with 2016 being the planned deadline,[80] more than 20 tunnel boring machines were used simultaneously to expedite the work,[81] however, the actual work is planned to be completed by end of 2018, subject to availability of land in certain pockets Phase-III lines are: Yellow Lineextension (Line 02) Violet Lineextension (Line 06) Gray Line (Line 09) Blue Line extension (Line 03) Green Lineextension (Line 05) Pink Line also called Inner Ring Road Line (Line 7)[85] Magenta Linealso called Outer Ring Road Line (Line 8) Red Lineextension (Line 01) Delhi Airport Metro Expressextension (Line 06) Aqua Line Noida-Greater Noida Metro (Not owned by DMRC) |
|