2023 2024 Student Forum > Management Forum > Main Forum

 
  #2  
2nd March 2020, 05:55 PM
Unregistered
Guest
 
Re: General aptitude test for MPPSC

Can you provide me some Aptitude Test - Time and Work Questions for preparation of Exam conducted by the Madhya Pradesh Public Service Commission (MPPSC)?
  #3  
2nd March 2020, 05:56 PM
Super Moderator
 
Join Date: Aug 2012
Re: General aptitude test for MPPSC

Some Aptitude Test - Time and Work Questions for preparation of Exam conducted by the Madhya Pradesh Public Service Commission (MPPSC) are as follows:


1. Vijay can do a piece of work in 24 days. Rakesh can do the same work in 30 days and Vinod in 40 days. Vijay and Vinod worked for 4 days and handed it to Rakesh. Rakesh worked for some days and handed it again to Vijay and Vinod 6 days before completing the work. For how many days did Rakesh work?
20 days 10 days 5 days 15 days None of these


2. Arnab is twice as fast as Bhanu, and Bhanu is one-third as fast as Chandu. If together they can complete work in 30 days, in how many days can Arnab, Bhanu and Chandu do the work respectively?
50, 180, 60 70, 180, 60 90, 180, 60 80, 180, 60 None of these


3. A contractor hire Amitabh Arora to complete the work and Amitabh can do the work in 25 days. Amitabh worked for 5 days and after that Bindu singh completed it in 20 days. In how many days will Amitabh and Bindu together finish the work?
(25/2) days (25/4) days (25/6) days (25/8) days None of these



4. It takes 6 workers a total of 10 hours to assemble a computer, with each working at the same rate. If six workers start at 9.00 am, and one worker per hour is added beginning at 3.00 pm, at what time will the computer assembled?
5.00 PM 4.00 PM 6.00 PM 7.00 PM 9.00 PM


5. A and B undertake a project worth Rs. 54000 . A alone can do the work in 10 days. They work together for 3 days. After 3 days, B works alone for 3 days and A completes the remaining work in 3 more days.What is the share of B in the earnings?
Rs. 21600 Rs. 31600 Rs. 41600 Rs. 51600 None of these


6. Radhe does 70% of some work in 15 days. Later, with Shyam’s help, she completes the remaining work in 4 days. In how many days can Shyam alone complete the entire work?
33.3 days 38.3 days 35.3 days 45.3 days None of these


7. The hourly wages of a mason have increased by 25%. Since the increase, the number of hours he works daily has reduced by 16%. If he was earning Rs. 120 per day before the increase, how much (in Rs.) is he earning now?
126.5 127 126 125 None of these


8. Four examiners can examine a certain number of papers in 10 days by working for 5 hours a day. For how many hours in a day can 2 examiners must work in order to examine twice the number of papers in 20 days?
50 hours 30 hours 20 hours 10 hours None of these


9. If a father or his two daughters or his three kids can finish a work in 88 days, then how many days will a man, a daughter and a kid together take to finish the same work?
42 days 44 days 46 days 48 days None of these


10. Pipe A is kept open throughout the time while Pipe B is open for first 8 minutes. After two minutes of closing of pipe B, pipe C is opened and kept open till the tank is full. Pipe D is opened for last 15 minutes. Each pipe fill an equal share of the tank. Pipe C and Pipe D can fill the tank together is 24 minutes. In how much time pipe A alone can fill the tank of same capacity.
50 minutes 60 minutes 75 minutes 80 minutes 100 minutes


11. A and B together can complete a work in 14(2/5) days while B and C together can complete the same work in 10(2/7) days. A alone starts work and after 8 days B replaced him. B did the work for next 12 days and the remaining work is completed by C in next 5 days, then find time taken by A, B & C together to complete that work, if C work with 50% of his usual efficiency?
9(2/9) days 7(2/7) days 9(2/7) days 10(2/7) days None of these


12. A road is built by P, Q & R, who are able to build the road in 8 days, 12 days and 10 days respectively when working alone. Every day along with P, Q works for half day, while R works for 2/3 rd of the day. If after four days P & R stopped working, then find the time taken by Q to build the remaining road while working full day?
2/3 days 4/5 days 1/5 days 1 days None of these


13. A can complete a work in 10 days, B in 12 days & C in 15 days. All of them began working together. But A left after 2 days of work and B 3 days before completion of the work. How long did the work last?
7 10 8 6 None of these


14. Either 6 men or 17 women can paint a wall in 33 days. The number of days required to paint three such walls by 12 men and 32 women working at same rate?
21.5 25.5 27 25 None of these


15. ‘B’ is 50% less efficient than ‘A’ and ‘C’ is 25% more efficient than ‘B’. ‘B’ alone can complete the work in 60 days. If ‘A’, ‘B’, ‘C’ together started the work, ‘A’ left 1 day before and ‘B’ left 6 days before completion of work, then find number of days for which ‘A’ worked?
12 days 16 days 24 days 15 days 9 days


16. A tank has four inlet pipes. Through the first three inlets pipes opened together, tank can be filled in 12 min and through the last three inlets, tank can be filled in 15 minutes and through the first and last inlets, tank can be filled in 24 minutes. Then find the time taken by last pipe to fill half of the tank?
80 min 60 min 40 min 20 min 30 min


17. A tank is filled by three pipes with uniform flow. The first two pipes operating simultaneously fill the tank in the same time during which the tank is filled by the third pipe alone. The second pipe fills the tank 5 hours faster than the first pipe and 4 hours slower than the third pipe. The time required by the first pipe is:
6 hours 10 hours 15 hours 30 hours None of these


18. A booster pump can be used for filling as well as for emptying a tank. The capacity of the tank is 2400 m3. The emptying capacity of the pump is 10 m3 per minute higher than its filling capacity and the pump needs 8 minutes lesser to empty the tank than it needs to fill it. What is the filling capacity of the pump?
20 m3 per minute 40 m3 per minute 50 m3 per minute 60 m3 per minute None of these


19. A can do a work in 21 days and B can do the same work in 14 days, working together in how many days they would complete the work?
(42/5) days (9/15) days (7/15) days (6/15) days (4/15) days


20. 18 men can earn Rs. 360 in 5 days. How much money will 15 men earn in 9 days?
540 240 340 640 740


21. If 4 men working 4 hours per day for 4 days complete 4 units of work, then how many units of work will be completed by 2 men working for 2 hours per day in 2 days?
1 2 (1/2) 3 4


22. A , B and C can complete the work in 15 days and A and B can complete the work in 20 days, than in how many days C alone can complete the whole work?
40 days 50 days 60 days 70 days 90 days


23. A skilled, a half skilled and an unskilled labourer work for 7, 8 and 10 days respectively and they together get Rs. 369 for their work. If the ratio of their each day's work is 1/3 : 1/4 : 1/6, then how much does the trained labourer get (in rupees)?
164 102.5 201.5 143.5 None of these


24. A tyre has two punctures. The first puncture alone would have made the tyre flat in 9 minutes and the second alone would have done it in 6 minutes. If air leaks out at a constant rate, how long does it take both the punctures together to make it flat? 3(1/5) min 3(2/5) min 3(3/5) min 3(4/5) min None of these


25. A & B can complete a piece of work in 20 days. They both start working together and after 8 days, A got ill. Due to A's sickness, A's efficiency fall down by 40% and thus the total work completed in 24 days, then find in how many days B alone can complete the remaining work after A got sick.
31 days 34 days 20 days 32 days None of the above


26. Bakery P can sell 500 bread in 4 hours, bakery Q can sell the same number of bread in 5 hrs while bakery R can sell them in 6 hrs. All the bakeries are opened at 8 AM while bakery P is closed at 9 AM and the remaining 2 bakeries complete the target of selling 500 breads. Approximately by what time will the work be finished?
10:00 AM 8:00 PM 9:00 PM 6:00 PM 4:00 PM


27. There are two pipes A and B which can fill a tank in 10 and 12 hours. They were opened together to fill a tank but there a leak in the pipe B due to which pipe B fill the tank with 'X' % of its usual efficiency and the tank got filled 6 hours then find value of X?
20 40 50 80 60


28. Ajay and Vijay undertake to do a piece of work for Rs. 960. Ajay alone can do it in 75 days while Vijay alone can do it in 40 days. With the help of Pradeep, they finish the work in 25 days. How much wage should Pradeep get for his work?
Rs. 280 Rs. 240 Rs.260 Rs. 270 None of these


29. 12 men and 15 women can finish a piece of work in 10 days and 21 women and 24 children can finish the same work in 15 days. In how many days 1 men, 3 women and 2 children together finish the same work, at their double efficiency?
30 days 33 days 36 days 38 days 34 days


30. Sheena and Sharmi together can do a piece of work in 24 days which Sharmi and Priya can do in 32 days. After Sheena has been working at it for 10 days and Sharmi for 14 days, Priya finishes it in 26 days. In how many days, Priya alone can complete the work?
12 24 36 48 60

31. Two identical walls of same height can be built in 8 hrs and 10 hrs by A and B respectively. If both starts building the wall at the same time, find after how much time ratio of the unbuild part of walls built by A and B become 15 : 16?
4 hrs 2 hrs 3 hrs 5 hrs 6 hrs


32. X can plough a farm in same time as Y and Z together can do it. If X and Y together do the same in 10 days and Z in 50 days then Y could do it alone in?
25 Days 100 Days 50 Days 150 Days None of these


33. Sachin and Advik can do a piece of work in 12 and 24 days respectively if they work alone. They began to work together but Sachin left 6 days before the work was over In how many days was the work completed?
16 days 12 days 24 days 36 days 28 days


34. A water tank has three taps A, B and C. A fills four buckets in 24 minutes, B fills 8 buckets in 1 hour and C fills 2 buckets in 20 minutes. If all the taps are opened together a full tank is emptied in 2 hours. If a bucket can hold 5 liters of water, what is the capacity of the tank? (Taps can be used inlet as well as outlet.)
120 liters 240 liters 180 liters 60 liters 90 liters


35. Three fill pipes A, B and C can fill separately a cistern in 12, 15 and 22 minutes respectively. A was opened first. After 2 minutes, B was opened and after 2 minutes from the start of B, C was also opened. Find the time when the cistern will be full after opening of C?
6(94/129) min 4(54/123) min 39(15/16) min 12(21/19) min None of these


36. Two taps can separately fill a tank in 12 min and 15 min. The first tap was replaced with a tap of double the radius and the second tap was replaced with a tap of half the radius. Now in what time will the tank get filled?
2(6/7) minutes 2(5/7) minutes 1(1/7) minutes 2 minutes None of these.


37. A, B and C can do a work in 8, 16 and 24 days respectively. They all begin together. A continues to work till it is finished, C leaving off 2 days and B one day before its completion. In what time is the work finished?
3 days 4 days 5 days 8 days 2 days


38. A can do a piece of work in 6 days which B can destroy in 4 days. A has worked for 6 days, during the last 2 days of which B has been destroying. How many days must A now work alone to complete the work?
7 days 5 days 3 days 2 days None of these


39. A person takes 8 minutes to type a page. If from 1 pm to 3 pm, 1710 pages are to be typed, how many persons should be employed for this job?
103 114 125 150 None of these


40. Raju and Dolu can complete a piece of work in 18 days and 24 days respectively. Raju and Dolu worked together for 6 days and then Raju left the work. If the remaining work completed by Dolu and Kalia in 4 days, then Kalia alone can complete the same piece of work in how many days?
16 days 20 days 18 days 24 days 30 days


Quick Reply
Your Username: Click here to log in

Message:
Options

Thread Tools Search this Thread



All times are GMT +5. The time now is 03:13 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
SEO by vBSEO 3.6.0 PL2

1 2 3 4