#1
22nd June 2015, 09:18 AM
| |||
| |||
AGBAOU gold mine
I am looking for the contact details and the location map of the Endeavour Mining Corporation of the AGBAOU. but I didn’t able to search. will you please give me the link from where I can get the contact details and the location map of the Endeavour Mining Corporation of the AGBAOU? give me the images of it as soon as possible?
|
#2
2nd December 2019, 08:31 AM
| |||
| |||
Re: AGBAOU gold mine
I want to know the Operating Performance of Low-Cost Agbaou Gold Mine so will you please tell me?
|
#3
2nd December 2019, 08:31 AM
| |||
| |||
Re: AGBAOU gold mine
The Low-Cost Agbaou Gold Mine was constructed ahead of schedule and under budget, achieving commercial production on January 27, 2014. Agbaou's low cost profile is a result of high plant throughput, very high recoveries, as well as low cost and reliable grid power. Operating Performance Operational Data FY-2015 FY-2016 FY-2017 Mining Waste (kt) 17,629 22,585 25,117 Ore Mined - open pit (kt) 2,818 2,797 2,983 Processing Ore Processed (kt) 2,665 2,827 2,906 Grade (g/t) 2.15 2.27 2.02 Recovery (%) 97% 97% 94% Production (oz) 181,365 195,505 177,191 Cash Costs Cash cost per gold ounce sold (US$/oz) 462 430 557 All-in Sustaining Costs (US$/oz) 576 534 647 Reserves and Resources On a 100% basis. Resources shown inclusive of Reserves Tonnage(Mt) Grade (Au g/t) Content (Au koz) Proven Reserves 1.0 1.41 44 Probable Reserves 7.9 2.45 624 P&P Reserves 8.9 2.34 668 Measured Resource (incl of reserves) 1.0 1.43 47 Indicated Resources (incl of reserves) 9.3 2.54 757 M&I Resources (incl of reserves) 10.3 2.43 804 Inferred Resources 1.0 1.74 54 Contact- Corporate Office 5 Young Street London United Kingdom W8 5EH +44 203 011 2723 |