#1
10th November 2014, 08:06 AM
| |||
| |||
Patratu Thermal Power Station Training
I am doing training from Patratu Thermal Power Station and for completion of training want to make PPT so please give details about this organization?
|
#2
10th November 2014, 08:45 AM
| |||
| |||
Re: Patratu Thermal Power Station Training
Here I am giving you details about Patratu Thermal Power Station for completion of your training. This information will surely helpful for you to make your power point presentation. Client: Bharat Heavy Electricals Ltd. (BHEL) Services: Operations & Maintenance / Modification/ Renovation/ Lifetime extension Period: 2007 – on going The assignment of company included following scope of work: Detailed engineering Cost estimate Preparation of technical specifications Technical support for bid evaluation Assistance in order finalization Technical assistance during execution & commissioning Steps by step information of Patratu Thermal Power for Power Point Presentation: Patratu Thermal Power StationA unit of Jharkhand Power Generation Corporation 1. PTPS A Brief Overview Vision, Mission Achievements 2. Thermal Power Plant An Overview Operation in Thermal Power Plant Instrumentation in Thermal Power Plant 3. Patratu Thermal Power Station Panipat Thermal Power Station (PTPS) is governed by Haryana State Electricity Board. Located at about 10 KMs away from Panipat on Panipat-Assandh road near the village Assan The total installed capacity at P.T.P.S is 4*110 MW + 2*210 MW + 2*250 MW 4. PTPS – Vision & Mission Vision to become a modern world class integrated power Generation Company, powering Haryana’s growth on all fronts by maximizing generation from existing plants" Mission Embarked on a mission to establish itself as a modern, growth oriented organization and to make its presence felt in the country’s dynamic power sector. 5. Thermal Power Plant Thermal Power Stations require a number of equipments performing a number of complex processes with the ultimate aim to convert chemical energy of coal or oil to electrical energy This involves the generation of steam in the boiler by burning coal 6. The steam in turn drives the turbine. The Turbo Generator coupled with the turbine produces electricity which is stepped up with the help of transformers and is fed into grid station through transmission lines. 7. Basic Idea of Electricity GenerationCoal is unloaded by electric traction system at Coal Yard Coal is crushed to finer pieces of order 20 mm Pulverization of Coal Coal is send to furnace with the help of FD fan Steam is generated at 540°C and 135 kg/sq.m Steam is send to Super heater Superheated steam is send to turbineProduction of Electricity by the generator coupled with 8. Elements of Thermal Power Station DM Plant Deaerator Boiler feed pump Economizer Air Pre-Heater Boiler Super heater Turbine Condenser 9. Coal Fired Power Plant 10. Instrumentation in Thermal Power Plant When the balance is disturbed, all the process variables deviatefrom their normal valves thus creating the necessity for thefollowing:- i) Instruments: To measure and indicate the amount ofdeviation ii) Automatic Control: To correct the deviation and bring backsystem to normal iii) Annunciation: To warn about the excessive deviations, ifany iv) Protection: To isolate the equipments process fromdangerous operating conditions cause due to such excessive deviations. 11. Selection Criteria of Instruments: Required accuracy of measurement Range of measurement The form of final data display required Principle of working Cost Calibration and repair facilities required/available Layout restrictions Maintenance requirements/availability 12. Temperature The degree of hotness and coldness measured on the definite scale: Methods of Temperature Measurement Resistance Temperature Detector (R.T.D) Thermocouple 13. Resistance Temperature Detector: Resistance of certain metals changes as the temp. changes as per formula given below :- Rt=Ro(1+wt) Where Rt=Resistance at temp. to be measured. Ro=Resistance at 0 degree C. w=Temp. coefficient of res. Thermometer metal t=Temp. to be measured. Mainly three metals copper, nickel and platinum are used as RTD. 14. Thermocouple: It consists of a pair of wire of different materials. Wires are joined at both ends one junction is kept at a high temp.called hot junction and the other is kept at a fixed at lower temp.called cold junction. Due to which emf is setup in the ckt known as Thermo emf. 15. Pressure Units for pressure measurement are Newton/m2 , Kg/cm2, mm of water column & mm of mercury column: Devices for Pressure Measurement Bourden Tube Pressure Gauge Manometer Vacuum Gauges 16. Bourden Tube PG Manometer Vacuum Gauges |
|