Barh Super Thermal Power Station or NTPC Barh is located in Barh in the Indian state of Bihar.

Barh has been named a mega power undertaking, and is possessed by Indian life association NTPC (National Thermal Power Corporation).

NTPC Barh Stage-I started in February 2005 is 3×660 Mw but it is markedly tardy calendar chiefly in light of long-standing contractual debates between NTPC and the Russian go hand in hand with Techno prom fare (TPE).

NTPC is India’s most imposing power-creating group with it is present yield being 2,500 MW.Around 3,300MW of coal-created power is almost always included at Barh close Patna in Bihar, India.

Project Cost

The plant is to produce 3,300MW of power at a cost of over Rs 26,000 crore.

The total approved cost of stage-1 (660MWx3) has Rs 8,692.97 crore. The total approved cost of stage-2 (unit 1) plant is Rs 7,688.12 crore.

Capacity

Unit-1 of stage-2 commissioned in November 2013. Sikkim and West Bengal were allocated some share of power from NTPC Barh units.

Inland Waterways Authority of India received bids in 2013 September for coal movement on 1620 km National Waterway 1 (India) from Haldia to NTPC's Barh which is about 1000 km away.

NTPC Coal based Thermal Power Plants:

Singrauli Super Thermal Power Station
NTPC Korba
NTPC Ramagundam
Farakka Super Thermal Power Station
Vindhyachal Super Thermal Power Station
Rihand Thermal Power Station
Kahalgaon Super Thermal Power Station
NTPC Dadri
Talcher Super Thermal Power Station
Feroze Gandhi Unchahar Thermal Power Station


Quick Reply
Your Username: Click here to log in

Message:
Options

Thread Tools Search this Thread



All times are GMT +5. The time now is 08:48 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
SEO by vBSEO 3.6.0 PL2

1 2 3 4