The Kolkata Metro or Calcutta Metro is a metro system serving the city of Kolkata.
The network consists of one operational line (Line 1) and one under construction (Line 2).
It was the first such form of transport in India, opening for commercial services in 1984.
It is the 17th zone of the Indian Railways system.

Kolkata Metro Master Plan



COVERED AREA IN MAP
Salt Lake City - Howrah Maidan
Joka - BBD Bagh
Noapara - Barasat via Netaji Subhas Chandra Bose International Airport
Baranagar - Barrackpore
Noapara - Dakshineswar
New Garia - Airport
Extension of Line 1 from Dum Dum to Dakshineshwar via Noapara

New Projects

•Joka-BBD Bagh via Majerhat (18.72 KM) with extension from Joka to Diamond Park

•Noapara – Barasat via Bimanbandar (18.13 KM)

•Dum Dum – Baranagar (4.5 KM)

•Baranagar - Dakshineswar – Barrackpore (14.5 KM)

•Kavi Subhash – Bimanbandar via Rajarhat (32.00 KM)

Contact:
METRO RAILWAY,
KOLKATA
METRO RAILWAY PBX NO.2226-7280-82, 2226-1054, 2226-1152
  #3  
5th February 2020, 09:38 PM
Unregistered
Guest
 
Re: Metro Rail Expansion Plan in Kolkata

Can you provide me the map and other important details of the Metro Railway, Kolkata?
  #4  
5th February 2020, 09:39 PM
Super Moderator
 
Join Date: Aug 2012
Re: Metro Rail Expansion Plan in Kolkata

Metro Railway, Kolkata is the first underground Metro in India. It extends from Noapara near Netaji Subhas Chandra Bose Airport, Kolkata to Kavi Subhash Metro station near Garia, over a length of 27.226 Kms. with 24 Stations & 15.70 Kms. of underground section.

It was the first metro railway in India, opening for commercial services from 1984. It is the sixth longest operational metro network in India after the Delhi Metro, Hyderabad Metro, Chennai Metro, Namma Metro and Noida Metro. On 29 December 2010, it became the 17th zone of the Indian Railways, operated by the Ministry of Railways.


Key Figures


Line 1

A) Noapara to New Garia (Kavi Subhash): 28.14 km – Operational
B) Noapara to Dakshineswar: 4.11 km – Under Construction

Line 2
Salt Lake Sector V to Howrah Maidan: 16.34 km – Under Construction
Note: This line is planned to be extended by 10 km to Satrangachi in the future

Line 3
A) Joka to Majerhat: 7.5 km – Under Construction
B) Majerhat to Esplanade: 8.25 km – On Hold

Line 4
A) Noapara to NSCBI Airport: 6.87 km – Under Construction
B) NSCBI Airport to Barasat: 11.26 km – On Hold

Line 5
Baranagar to Barrackpore: 12.50 km – On Hold
Note: This line might function as an extension/spur of Line 1 when it becomes operational

Line 6
New Garia (Kavi Subhash) to NSCBI Airport: 32 km – Under Construction


Operational Network



Operational & Under Construction Lines




Future Network (2025)



Quick Reply
Your Username: Click here to log in

Message:
Options




All times are GMT +5. The time now is 03:10 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
SEO by vBSEO 3.6.0 PL2

1 2 3 4