2023 2024 Student Forum > Management Forum > Main Forum

 
  #2  
15th December 2015, 04:00 PM
Super Moderator
 
Join Date: May 2012
Re: University of Mumbai paper solutions

As per your requirement here I am sharing the Software Engineering Semester 6 question paper of University of Mumbai

N.B. : (1) Question no 1 is compulsory.
(2) Attempt any four questions out of remaining six questions.
(3) All questions carry equal weightage.
(4) Figures indicate right marks.
(5) Assume data wherever necessary.

1. (a) Discuss incremental process model and evolutionary process model with reference to the suitability of the project. --- (10 Marks)
(b) Explain how size oriented metrics differs from function oriented metrics. Give example which each are recommended. --- (10 Marks)

2. (a) Give software requirement specification (SRS) for developing a software for pay roll management system. --- (10 marks)
(b) Workout data flow diagram and control flow diagram in detail respect to payroll management system. --- (10 marks)

3. (a) Explain the various levels of quality assurance in software Engineering with reference to different parameters of quality. --- (10 Marks)
(b) What is configuration audit? How change in managed in web applications. --- (10 marks)

4. (a) Discuss and compare TDD (Test Driven Development) and DDT (Design Driven Testing). --- (10 Marks)
(b) What activities are carried out during FTR and status reporting and why? --- (10 marks)

5. (a) List down and explain the activities carried out during scheduling and tracking. --- (10 Marks)
(b) Discuss the cases where the change control and version control are required with its purpose. --- (10 Marks)

6. (a) Compare the conventional approach and object oriented approach to software development with suitability. --- (10 Marks)
(b) What is requirement of risk analysis? What are the possible risks that may affect the scheduling? How you can overcome the same? --- (10 Marks)

7. Write short note on:- --- (20 marks)
(a) SCRUM and CRYSTAL
(b) Design concepts and principles
(c) Coupling and cohesion
(d) Gantt chart.


Quick Reply
Your Username: Click here to log in

Message:
Options




All times are GMT +5. The time now is 06:50 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
SEO by vBSEO 3.6.0 PL2

1 2 3 4