#1
4th May 2015, 04:58 PM
| |||
| |||
TC AIMS II Component Listing
Kindly provide me with the detailed information about the Technical Coordinators' Automated Information for Movement System II. I am doing my research on this topic and I have been told that it is a top-down directed program aimed at addressing critical shortfalls. Kindly elaborate.
|
#2
8th July 2018, 07:16 AM
| |||
| |||
Re: TC AIMS II Component Listing
Hii sir, I Wants to get the Information About the TC-Aims Ii Version 2.0 Army Supportability Strategy Will you Please Provide It ?
|
#3
8th July 2018, 07:20 AM
| |||
| |||
Re: TC AIMS II Component Listing
This Supportability Strategy (SS) provides, in one document, essential information for the successful accomplishment of Integrated Logistic Support (ILS) for Transportation Coordinators Automated Information for Movement System II (TC-AIMS II) Objectives : The following objectives are established for this Supportability Strategy: (1) Identify and document logistics requirements or constraints. (2) Describe required logistics actions, tasks, and milestones. (3) Ensure all relevant ILS elements have been considered. (4) Provide logistic information for milestone review decision-making. (5) Establish responsibilities for ILS program participants. (6) Integrate ILS planning for both the hardware and software aspects of the Major Component Pedestal footprint\Rack Mounted. Dual Hot swappable power supplies 110/220VAC, auto-sensing/switching Minimum ten 18.2 GB HD (configured as four RAID1 drives) Ultra160 SCSI disk drives on a dual channel RAID controller drives with 15k RPM formatted NTFS & configured as: Drive 1 C: (System) Drive 2 D: (Apps) Drive 3 E: (Logs) Drive 4 F: (Backup) Drive 5 G: (Data) TC-Aims Ii Version 2.0 Army Supportability Strategy For more Information you may Consider the below Attachement that is Free to Download |
|