2023 2024 Student Forum > Management Forum > Main Forum

 
  #1  
4th May 2015, 04:58 PM
Unregistered
Guest
 
TC AIMS II Component Listing

Kindly provide me with the detailed information about the Technical Coordinators' Automated Information for Movement System II. I am doing my research on this topic and I have been told that it is a top-down directed program aimed at addressing critical shortfalls. Kindly elaborate.
Similar Threads
Thread
PHD in NMR in AIMS
Tc-aims
Shipping Corporation Of India IPO Listing Price
NTPC Debentures Listing
MBA Pak AIMS
GNM job in AIMS
NHPC IPO Listing Price
Listing of Powergrid FPO
Punjab and Sind Bank Listing Price
Coal India IPO Listing Price
United Bank of India IPO Listing Date
Hwdsb ca schools school listing
Duration and fee for Diploma course in hearing listing & speech (D.H.L.S.)
Details about Diploma Course in Hearing Listing & Speech
Coal India IPO Price on Listing
EIL FPO listing
Coal India Price Of Listing
IIM short listing criteria
Punjab and Sind Bank Listing Date IPO
IIM Short Listing Criteria -14
  #2  
8th July 2018, 07:16 AM
Unregistered
Guest
 
Re: TC AIMS II Component Listing

Hii sir, I Wants to get the Information About the TC-Aims Ii Version 2.0 Army Supportability Strategy Will you Please Provide It ?
  #3  
8th July 2018, 07:20 AM
Super Moderator
 
Join Date: Aug 2012
Re: TC AIMS II Component Listing

This Supportability Strategy (SS) provides, in one document, essential information for the successful accomplishment of Integrated Logistic Support (ILS) for Transportation Coordinators Automated Information for Movement System II (TC-AIMS II)

Objectives :

The following objectives are established for this Supportability Strategy:
(1) Identify and document logistics requirements or constraints.
(2) Describe required logistics actions, tasks, and milestones.
(3) Ensure all relevant ILS elements have been considered.
(4) Provide logistic information for milestone review decision-making.
(5) Establish responsibilities for ILS program participants.
(6) Integrate ILS planning for both the hardware and software aspects of the

Major Component

Pedestal footprint\Rack Mounted. Dual Hot
swappable power supplies 110/220VAC,
auto-sensing/switching

Minimum ten 18.2 GB HD (configured as four RAID1 drives) Ultra160 SCSI disk
drives on a dual channel RAID controller drives with 15k RPM formatted NTFS &
configured as: Drive 1 C: (System)
Drive 2 D: (Apps)
Drive 3 E: (Logs)
Drive 4 F: (Backup)
Drive 5 G: (Data)

TC-Aims Ii Version 2.0 Army Supportability Strategy






For more Information you may Consider the below Attachement that is Free to Download
Attached Files
File Type: pdf TC-Aims Ii Version 2.0 Army Supportability Strategy.pdf (1.78 MB, 243 views)


Quick Reply
Your Username: Click here to log in

Message:
Options




All times are GMT +5. The time now is 02:56 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
SEO by vBSEO 3.6.0 PL2

1 2 3 4