2023 2024 Student Forum > Management Forum > Main Forum

 
  #2  
7th November 2015, 02:49 PM
Super Moderator
 
Join Date: Apr 2013
Re: Sardar Sarovar Narmada Nigam Limited Pune

Sardar Sarovar Narmada Nigam Limited works on Sardar Sarovar Projec for harnessing the unused waters of the narmada for the survival of millions of people.

Project at a Glance:

Estimated Cost –
Rs. 392.4 billion (8 billion USD)

Main Dam –
1,210 m long, 163 m high from the deepest foundation level

Designed Live Storage Capacity of the Reservoir
5860 MCM (4.75 million acre feet)

Hydropower –
1,450 MW installed capacity (1 billion kWh every year)

Irrigation –
1.905 million Ha (1.8 million Ha. in Gujarat benefitting 1 million farmers)

Drinking Water –
9490 villages and 173 towns (29 million people)

Canal Network –
Approximately 75,000 km length within Gujarat

Main Canal –
458.318 km long, capacity 1,133 m3/second, 633 structures

No. of Employees –
4673

Contact detail :
Sardar sarovar narmada nigam ltd.
Block No. 12, New Sachivalaya,
Gandhinagar - 382 010.
Gujarat, India.
Fax:- +91 79 23223056
Corporate Identity Number(CIN) of SSNNL - U45200GJ1988SGC010493.


Quick Reply
Your Username: Click here to log in

Message:
Options

Thread Tools Search this Thread



All times are GMT +5. The time now is 04:10 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
SEO by vBSEO 3.6.0 PL2

1 2 3 4