Unregistered 5th May 2015 10:32 AM

NTPC Khargone
 
Will you please tell me is it true that the NTPC invites bids for Khargone project in Madhya Pradesh? If yes then will you please tell me what is the motto of this project? Give me the information about how much money will be spend on this project which is going to be started by the NTPC Khargone?

Unregistered 13th April 2018 09:12 AM

Re: NTPC Khargone
 
I shifted to Selda, Madhya Pradesh and searching for details about the NTPC Khargone Super Thermal Power Station. Will you provide me basic details about NTPC Khargone Super Thermal Power Station project along with its Configuration and also tell Key Technical Features?

pawan 13th April 2018 09:13 AM

Re: NTPC Khargone
 
Khargone Super Thermal Power Station is an upcoming coal-based thermal power project, located at village Selda and Dalchi in Khargone district in Indian State of Madhya Pradesh.

The project site is about 105 km from Indore and about 30 km from Sanawad town

About 2x660 MW NTPC Khargone Ultra Super Critical Power Plant, MP, India

Name of Project : 2x660 MW NTPC Khargone Ultra Super Critical Power Plant, MP, India

Owner : NTPC Ltd, India

Client : Larsen & Toubro Limited, India

Capacity : 2x660 MW (Ultra Supercritical)

L&T-S&Ls scope : Complete Basic and Detail engineering for the entire EPC of the project

Configuration :

Two (2) L&T-MHPS make Boilers with side mill arrangement
Two (2) L&T-MHPS make Steam Turbine Generators (STGs)

Key Technical Features :
Supercritical, Single Reheat, Once through, Balance Draft, PF Fired Boilers with vertical water walls and internal rifle tubes simpler in construction having lower pressure drop. Furnace designed for lower slag deposition and lower NOx fuel firing system
STG of capacity 660 MW (270 kg/cm(a) / 600 C configuration) each consists of one HP, one IP and two (2) LP cylinders, tandem compound quadruple exhaust, condensing reheat turbine designed for high operating efficiency and maximum reliability
STG auxiliaries like Boiler Feed Pumps (BFP), Condensate Extraction Pump (CEP), Condensate Polishing Unit, LP Heater Drain Pump, DM cooling water pumps, Vacuum pumps, heat-exchangers etc.
Deaerator, LP Heaters (5 Nos.) & Double Train of HP Heaters (3 Nos.) with Topping Desuperheater
Dual pressure once through type Condensers having divided water box
Metallic casing type cooling water pumps
Two (2) Induced Draft Cooling Tower
275 m High twin flue chimney.
Solar Panels on the roof of selected buildings

Contact:

NTPC Khargone  
Thermal energy company in Madhya Pradesh
Address: Selda, Madhya Pradesh 451113