2023 2024 Student Forum > Management Forum > Main Forum

 
  #2  
28th March 2016, 02:23 PM
Super Moderator
 
Join Date: May 2012
Re: NTPC Bhilai

NTPC Ltd formed joint venture Company with SAIL on 50:50 basis in March 2002 in the name of Bhilai Electric Supply Company (P) Ltd (BESCL).

Scope of the work involves

Setting up a coal handling plant for a-2X250 MW coal fired power plant for NSCPL, a joint venture between NTPC and SAIL
Complete civil work, fabrication and erection of building and technological structural and equipment supply, erection, testing and commissioning

Civil work involves approximate 30,000 cubic meters concrete and building structural approximately 3800 MT

Supply and installation of Rotary Plough Feeder (04), Stacker Re claimer (01), Wagon Tippler with Side Arm Charger (01),

Crusher R-33 (04), truflo feeders, belt feeders (06) and vibro feeders (all 01), Travelling Tippers (02) and a coal sampling system

Being a turn key order, TRF will supply all conveying equipment and undertake all electrical work

Setting up some utility systems for dust suppression, dust extraction, fire fighting and ventilation system

Radial Stacker re-claimer that will be set up by TRF has been supplied by Schade, Germany.

This is the biggest ever Radial Stacker re-claimer made by Schade.

It is approximately 700 MT machine, with central column as the axis, on which it rotates on a circular rail of 128 metres diameter

Wagon Tippler with hydraulic drive supplied here is the first of it's kind by TRF

Conveyor # 5 gallery is unique as it hangs from both ends from the drive house

In total, there are four transfer points, a drive house, crusher house and a sampling station

There are 16 conveyors


Quick Reply
Your Username: Click here to log in

Message:
Options

Thread Tools Search this Thread



All times are GMT +5. The time now is 01:28 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
SEO by vBSEO 3.6.0 PL2

1 2 3 4