Can you provide me the details of Substations under Transmission Wing as on 30.06.2015 of KSEB (Kerala State Electricity Board Limited)?
Similar Threads
Thread
Kseb oa
KSEB Substation
Powergrid Practices In EHV Substation Layout
vendor list of substation structure
Northern Powergrid Substation Drawings
Kseb da
Kseb lt
Kseb ewf
Kseb pse
KSEB Kalady
KSEB wallpapers
KSEB Krishnapuram
Ae kseb
Ht Tariff KSEB
Kaloor KSEB
KSEB Vellangallur
Powergrid Substation
Kseb rti
Kseb acd
Kovoor KSEB KPSC KSEB Mazdoor Result
  #2  
17th January 2017, 08:38 AM
Super Moderator
 
Join Date: Aug 2012
Re: KSEB Substation Details

The details of Substations under Transmission Wing as on 30.06.2015 of KSEB (Kerala State Electricity Board Limited) are as follows:

I. 400 kV Substation in Operation

Madakkathara Thrissur 3x315 945.00 400/220 1993 &1995
2x200 400.00 220/110
2x10 20.00 110/11
1,365.00

II. 220 kV Substations in Operation

1 Areacode Malappuram 1x160 160.00 220/110 May-98
1x12.5 + 1x10 22.50 110/11 May-98

2 Ambalamugal (BPCL)
Kalamassery 1x50 50.00 220/33 04/12

3 Brahmapuram Kalamassery 2x160 320.00 220/110 Nov-99
1x12.5 + 1x10 22.50 110/11 Nov-99

4 Edamon Kottarakara 2x100 200.00 220/110 1,978.00
2x40 80.00 110/66 1,978.00
2x10 20.00 66/11 1978/14.2.14

5 Edappon Alappuzha 2x200 400.00 220/110 May-09
2x63 126.00 110/66 May-09
1x16 16.00 110/33 May-09
3x10 30.00 66/11 May-09

6 Kalamassery Kalamassery 3x200 + 1x120 720.00 220/110 1,965.00
2x63 126.00 110/66 1,965.00
2x10 20.00 110/11 1,965.00




Quick Reply
Your Username: Click here to log in

Message:
Options




All times are GMT +5. The time now is 06:38 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
SEO by vBSEO 3.6.0 PL2

1 2 3 4