2023 2024 Student Forum > Management Forum > Main Forum

 
  #2  
19th April 2017, 02:21 PM
Super Moderator
 
Join Date: Mar 2013
Re: Full Address of Jadavpur University

Jadavpur University is in Kolkata. It stands on Raja S. C. Mullik Road in the southern parts of the city. It is well connected through all means of surface transport.

The main campus stands on a sprawling 58 acres on Raja S.C. Mullik Road - 8 km by local rail from Sealdah Railway Station; 15 km. by road from Howrah Station and 25 km from Netaji Subhas Chandra Bose International Airport and 3 km by road from Metro Railway (urban speed transport system) Station at Tollygunge.

The University has a second campus of 26 acres at Salt Lake which also is well connected from the major terminal points.

Contact Detail:

Main Campus
188, Raja S.C. Mallick Rd,
Kolkata - 700032

Salt Lake Campus
Plot No.8, Salt Lake Bypass, LB Block,
Sector III, Salt Lake City,
Kolkata – 700098

Central Facilities

Existing Facilities
• Hostel
• Guest House
• Library
• Day Care Centre
• Health Centre
• JU Employees' Coop Credit Society Limited

Recent Infrastructural Development
The university is extremely keen on betterment of infrastructure to promote a more conducive academic environment.

At the Main Campus:
• Reconstruction of Gandhi Bhavan auditorium
• Composite Building for the Science Departments
• Composite Building for the Arts and Social Science Departments
• Teachers' Quarter
• Two floors of Rabindra Bhavan
• Officers' Quarter
• Thorough restructuring of Open Air Theatre
• Three floors of Subarna Jayanti Bhavan
• Toilet and ramp in sixteen buildings for the physically challenged persons
• International Guest House at Padmapukur
• Sports Centre (work started)
• Technology Bhavan (under construction)
• Electrical revamping (work started)
• Construction of drinking water tanks

At the Saltlake Campus:
• Guest House for the Academic Staff College
• Artificial rock
• Auditorium (work started)

At the West Annexe (NIL) campus:
• Thorough renovation of two portions of the existing building
• Thorough renovation of sewer and drainage system

Last edited by Rajkumar Agarwal; 19th April 2017 at 02:39 PM.


Quick Reply
Your Username: Click here to log in

Message:
Options




All times are GMT +5. The time now is 04:49 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
SEO by vBSEO 3.6.0 PL2

1 2 3 4