Re: Entrance Criteria For The Engineering And Manufacturing Development Phase

Engineering And Manufacturing Development Phase is a phace of the Acquisition Process.

As you want I am here telling you about Entrance Criteria For The Engineering And Manufacturing Development Phase.

Entrance Criteria:
1.Final demonstration : all sources of risk been adequately mitigated to support a commitment to design for production.
2. validatiojn of the capability requirements.
3.Full funding in the FYDP
4.Compliance with affordability goals for production
Sustainment.

Acquisition Process.




Major reviews of the EMD Phase:
Integrated Baseline Review (IBR)
System Verification Review (SVR)
Functional Configuration Audit (FCA)
Production Readiness Review (PRR)
Technology Readiness Assessment (TRA)
Critical Design Review (CDR)
Test Readiness Review (TRR)
Flight Readiness Review (FRR)


Quick Reply
Your Username: Click here to log in

Message:
Options




All times are GMT +5. The time now is 10:52 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
SEO by vBSEO 3.6.0 PL2

1 2 3 4