I am resident of Delhi and have heard about the Okhla metro station of DMRC. I also have heard that DMRC announces 2 more Metro stations for Okhla. Is this information is correct if yes please tell me the DMRC metro line in which this Okhla metro station comes under?
Similar Threads
Thread
NDIM Okhla Placements
NDIM Okhla Affiliation
Eapplynew DMRC Pages DMRC Preview
IIT Delhi Okhla
PTC Okhla
Bank of Baroda Okhla
MBA Institute in Okhla
NTPC Okhla
HCL Okhla
Syndicate Bank In Okhla
Okhla MBA College
MBA College In Okhla Delhi
NDIM Okhla Map
IIIT Delhi Okhla
PNB ATM in Okhla
UGC NET Coaching in Okhla
Power Grid Okhla
IAS Coaching In Okhla
NDIM Okhla Review
MBA Colleges Okhla
  #2  
19th February 2016, 10:44 AM
Unregistered
Guest
 
Re: DMRC Okhla

Hello sir ! I am from Delhi will you please provide me information about Metro Trials Extended to Okhla ?
  #3  
19th February 2016, 10:44 AM
Super Moderator
 
Join Date: May 2012
Re: DMRC Okhla

Hello buddy as we have information about Metro Trials Extended to Okhla
here we provides you as follows

Okhla is a Delhi Metro station in Delhi. It is located between Govind Puri and
Jasola Apollo stations on the Violet Line.

The station was opened with the first section of the Line on 3 October 2010 in
time for the Commonwealth Games opening ceremony on the same day

Delhi Metro Rail Corporation has Energized the Metro section between
Nehru Place to Okhla today evening and the first Metro train is expected to
start trial on this section after 9 PM tonight.

first train which will move on this section will have officers from the
Signalling and Telecom (S&T), Track, Permanent Way (Civil) and Electrical
Department who will travel in the cab along with the train operator to
monitor the first trial run.

Energization of this three kms long section involved the erection of 225
electrical overhead masts (poles) which the DMRC erected in a record time
of only 15 days which otherwise would have required at least 45 days
normally.

Work was speededup by DMRC by employing extra electrical gangs
(manpower) and resources since the DMRC wants to commission this line by
the end of this month to keep its target of opening this line before the
Commonwealth Games.

The time given for the construction of this line was the shortest since only 41
months was given to DMRC for this construction as this line was sanctioned
in April 2007. The electrical power for this section will be drawn from the
New Delhi substation of DMRC while the Qutab Minar substation will act as a
backup.

This is the second Standard Gauge corridor after the InderlokMundka corridor
of the DMRC. This entire line consists of 16 stations with Central Secretariat,
Khan Market, Jawarharlal Nehru (JLN) Stadium, Jangpura Metro stations
being the underground ones and Lajpat Nagar, Moolchand, Kailash Colony,
Nehru Place, Kalkaji Mandir, Govindpuri, Okhla, Jasola, Sarita Vihar, Mohan
Estate, Tughlakabad and Badarpur Metro stations being the elevated one

CONTACT INFORMATION


Metro Bhawan Fire Brigade Lane, Barakhamba Road,


New Delhi 110001, India

Board No. 23417910/12


Quick Reply
Your Username: Click here to log in

Message:
Options

Thread Tools Search this Thread



All times are GMT +5. The time now is 05:10 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
SEO by vBSEO 3.6.0 PL2

1 2 3 4