2023 2024 Student Forum > Management Forum > Main Forum

 
  #1  
28th April 2016, 09:53 AM
Unregistered
Guest
 
Turial NEEPCO

Hi I would like to have the details of the Tuirial dam which is being constructed by the North Eastern Electric Power Corporation Ltd?
Similar Threads
Thread
NEEPCO School
NEEPCO Ltd Delhi
NEEPCO India
Cmd neepco
Training in NEEPCO
Internship In NEEPCO
NEEPCO Exam
NEEPCO Details
NEEPCO Kolkata
Neepco History
Full Name of NEEPCO
NEEPCO job opening
Bhel neepco
NEEPCO Notification
NEEPCO Advertisement
New CMD NEEPCO
NEEPCO Chairman
NEEPCO Doimukh
NEEPCO Geologist
NEEPCO Nagaland
  #2  
28th April 2016, 09:54 AM
Super Moderator
 
Join Date: May 2012
Re: Turial NEEPCO

Tuirial dam is an earthfill and gravity dam, as of now under development on the Tuirial River close Kolasib in the condition of Mizoram in India.

The basic role of the dam is hydroelectric force creation and the principal generator is relied upon to be operational in 2016, the second in 2017

Tuirial H.E. Undertaking is imagined as a medium head stockpiling plan with an introduced limit of 60 MW (2 x 30 MW). The Project builds up the most reduced conceivable phase of the Tuirial stream framework and is situated in the Aizawl area of Mizoram bordering Cachar region of Assam.

The task is open from Silchar by means of Bhagabazar-Natachera-Saiphai-Saipum. The closest railhead is Silchar and common air terminal is Aizawl. The yearly vitality era from the Project is assessed to be 250.63 Million Units (MU) in a 90% reliable year.

Development of 60 MW hydroelectric force station started in 1998 by NEEPCO yet was stopped in 2004 by the Tuirial Crop Compensation Claimant Association of which the Mizo National Front then Chief Minister Pu Zoramthanga's relatives figured among nine individuals named in Central Bureau of Investigation charge sheet

At the point when Pu Lalthanhawla, who had begun the undertaking returned power, he took activities to restart the venture.

The Cabinet Committee on Economic Affairs (CCEA) endorsed the 60 MW Tuirial Hydro Electric Project (THEP) venture costing Rs 913 crore in 2010.

Because of street conditions and inaccessibility of total, the undertaking is relied upon to be finished in 2017.

The CCEA freedom of the Project was gotten on seventh July, 1998. Whole works of the Project were ordered in five unique Packages viz. Part I (Diversion Tunnels), Lot-II (Dam and Spillway), Lot-III (Power House), Lot-IV (HM works) and Lot-V (EM works). All the significant bundles of the Project with the exception of Lot-IV were granted to the most reduced fruitful bidder(s) chose through International Competitive Bidding (ICB).

Contact Details:


North Eastern Electric Power Corporation Ltd
Brookland Compound,
Lower New Colony,
Shillong-793 003,Meghalaya,India.
Telephone Number: +91-364-2224582
Email Id: info@neepco.gov.in


Quick Reply
Your Username: Click here to log in

Message:
Options

Thread Tools Search this Thread



All times are GMT +5. The time now is 01:09 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
SEO by vBSEO 3.6.0 PL2

1 2 3 4