2023 2024 Student Forum > Management Forum > Main Forum

 
  #1  
5th November 2015, 03:24 PM
Super Moderator
 
Join Date: Aug 2012
Six sigma MBA notes

Welcome to MBA Forum. This is Six sigma MBA notes discussion page. Here you can discuss about Six sigma MBA notes in details. Please ask your question about Six sigma MBA notes in the quick reply box mention below. Our member will try to answer your question about it as soon as possible. Furthermore, please provide your full details with your question. Your Name, email address, phone numbers, also you education / University in which you are studying. If your question is related to any institution / University / Business School/ Online MBA / Distance MBA or Jobs related to MBA, then mention that in your question as well.
Similar Threads
Thread
MBA Six Sigma Online
Six sigma MBA online
DCE sigma Aldrich
MBA Six Sigma Jobs
MBA Seis sigma
MU Sigma In SRM University
SIGMA Institute
IIM Bangalore Six Sigma
Six Sigma Certification Cincinnati
Six Sigma Training Dallas
MBA Six Sigma Salary
Six Sigma Classroom Training
Six sigma courses in chennai
Become Six Sigma Certified
IIT Bombay Six Sigma
MBA six sigma ppt
Sigma aldrich MBA
CCSU Six Sigma
PTU Sigma
MU Sigma placement papers
  #2  
13th August 2018, 01:05 PM
Unregistered
Guest
 
Re: Six sigma MBA notes

Hii sir, I Wants to get the Information About Six Sigma MBA Projecy Methodology you Please Provide It ?
  #3  
13th August 2018, 01:05 PM
Super Moderator
 
Join Date: Aug 2012
Re: Six sigma MBA notes

The Six Sigma MBA Project methodology is given below

DMAIC

The DMAIC project methodology has five phases:


Define the problem, the voice of the customer, and the project goals, specifically.
Measure key aspects of the current process and collect relevant data.
Analyze the data to investigate and verify cause-and-effect relationships. Determine what the relationships are, and attempt to ensure that all factors have been considered. Seek out root cause of the defect under investigation.
Improve or optimize the current process based upon data analysis using techniques such as design of experiments, poka yoke or mistake proofing, and standard work to create a new, future state process. Set up pilot runs to establishprocess capability.
Control the future state process to ensure that any deviations from target are corrected before they result in defects. Implement control systems such as statistical process control, production boards, and visual workplaces, and continuously monitor the process.

DMADV
The DMADV project methodology, features five phases:

Define design goals that are consistent with customer demands and the enterprise strategy.
Measure and identify CTQs (characteristics that are Critical To Quality), product capabilities, production process capability, and risks.
Analyze to develop and design alternatives, create a high-level design and evaluate design capability to select the best design.
Design details, optimize the design, and plan for design verification. This phase may require simulations.
Verify the design, set up pilot runs, implement the production process and hand it over to the process owner.


Quick Reply
Your Username: Click here to log in

Message:
Options




All times are GMT +5. The time now is 04:38 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
SEO by vBSEO 3.6.0 PL2

1 2 3 4