Can you ell me in detail about the Requirements and processes in Operation & Maintenance department of Power Grid Corporation of India Ltd?
Similar Threads
Thread
Power Grid Smart GRID
Power Grid NL
Power Grid Crossfit
Buy power grid
Power Grid Law
BC Power Grid Map
Power Grid Corporation RTI
Power Grid Rate
Power Grid Photos
Ceiling Power Grid
Power grid AGM
Power Grid CTC
Power Grid IPO
Power Grid PDF
Power Grid HK
Information about Power Grid
Power Grid Office
Power Grid
Power System Operation and Control BPUT
Power Grid CTC
  #2  
3rd December 2015, 07:42 AM
Super Moderator
 
Join Date: May 2012
Re: Power Grid Operation

Power Grid Corporation of India Ltd. takes constant action regarding operation and maintenance to look for fulfillment with prescribed standards to achieve high availability of the system for uninterrupted power supply to customers.

Requirements and processes by POWERGRID:

• Condition measurement and monitoring techniques are used to help optimize maintenance intervals and reduce system outages

• POWERGRID developed flexible working practices to take advantage of the system conditions for everyday maintenance work and also modify the annual maintenance programme according to generation maintenance schedules

• Techniques like - live-line working are also used to allow certain types of maintenance to be carried out without taking transmission lines out of service

• Emergency restoration systems are used for early renovation in case of natural disasters and other exigencies.

It has achieved an availability of 99.95% per year.

It adopts Hot line maintenance of transmission lines and Substation equipment to ensure the high availability.

Emergency Restoration Systems are organizing to restore collapsed towers due to natural calamity in shortest possible time and use of helicopters for transmission line patrolling and washing of insulators.

Spares are administer and kept at appropriate locations for early restoration and minimize outage.

Extensive on-line health assessment and monitoring equipments are fixed at important equipment for continuous health monitoring.

Well equipped, accredited Oil Testing Laboratories are established at 6 locations across India for Condition Assessment of oil filled equipment.

Measures employed by POWERGRID:

Technology:

It has modernized all the Regional Load Dispatch Centres (RLDCS) with the state-of-the-art Unified Load Despatch & Communication (ULDC) schemes at a cost of about Rs. 2,000 Crore.

Manpower:
Expert manpower has been deployed to make the fullest use of the technology employed. These modernized RLDCs are greatly contributing to bring quality and economy in the operation of the power system besides improving data availability, visibility and transparency.


Quick Reply
Your Username: Click here to log in

Message:
Options

Thread Tools Search this Thread



All times are GMT +5. The time now is 02:36 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
SEO by vBSEO 3.6.0 PL2

1 2 3 4