2023 2024 Student Forum > Management Forum > Main Forum

 
  #1  
20th January 2017, 04:49 PM
Unregistered
Guest
 
Overview of NTPC Barh

I am searching for overview of Barh Super Thermal Power Station of NTPC. So is there anybody who will provide information about Barh Super Thermal Power Station of NTPC?
Similar Threads
Thread
NTPC Barh in Bihar Summer training
Overview of ECIL
NTPC Barh II Project
BPCL Company Overview
CAT Exam Overview
NTPC BARH SBI IFSC Code
ONGC Overview
JEE Advanced Overview
GMAT Overview
MBA Overview
ACN Business Overview
IT Industry Overview
NTPC Ramagundam Overview
National Thermal Power Corporation Barh
NTPC Barh recruitment
MBA overview
NCBS Overview
AFCAT Overview
Image of NTPC BARH
JMI Company Overview
  #2  
20th January 2017, 05:56 PM
Super Moderator
 
Join Date: Mar 2013
Re: Overview of NTPC Barh

The Barh Super Thermal Power Station was begun in 1999 by NTPC.

The Power Station is situated in Bihar State.

The 1,980MW (3x660 MW) Barh Stage-1 is being built by Russian firm Technopromexport (TPE), and 1,320MW (2x660 MW) Barh Stage-2 extension is being built by BHEL
Bihar's share is 1183 MW from NTPC Barh(26% from stage 1 and 50% from stage 2).

The main power plant and the township is spread over an area of 1,186 acres.

The plant is to produce 3,300MW of power at a cost of over Rs 26,000 crore.

Capacity

Stage Unit Number Capacity (MW) EPC Contractor
1st 1 660 MW Technopromexport
2 660 MW Technopromexport
3 660 MW Technopromexport

2nd 4 660 MW Bharat Heavy Electricals
5 660 MW Bharat Heavy Electricals

Total Five 3300 MW


Quick Reply
Your Username: Click here to log in

Message:
Options

Thread Tools Search this Thread



All times are GMT +5. The time now is 07:06 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
SEO by vBSEO 3.6.0 PL2

1 2 3 4