Ntpc tstps

Where does the Talcher Super Thermal Power Station (TSTPS) which is formerly known as the NTPC Talcher Kaniha located ? Provide the information regarding the annual Power Utility of the TSTPS or NTPC Talcher Kaniha .
Similar Threads
Thread
NTPC Vendor Registration In NTPC
NTPC About
Up ntpc
Srm ntpc
Ntpc ncd
Ntpc kv
NTPC Gm Name
NTPC through PSU
CMD NTPC Fax No
NTPC job ITI
Pmi ntpc
Welcome NTPC
All about NTPC
Mba ntpc
Ntpc rdm
VT at NTPC
CTC Of NTPC
Dvc ntpc
Ess ntpc
Fsa ntpc
  #2  
10th July 2018, 06:55 PM
Unregistered
Guest
 
Re: Ntpc tstps

Can you provide me the details of the TSTPS (Talcher Super Thermal Power Station) or NTPC Talcher Kaniha - Coal Based Power Station?
  #3  
10th July 2018, 06:55 PM
Super Moderator
 
Join Date: Aug 2012
Re: Ntpc tstps

TSTPS (Talcher Super Thermal Power Station) or NTPC Talcher Kaniha located in Angul district of the Indian state of Odisha is the first mega power plant of India to have an installed generation capacity of 3000MW.

The power plant is one of the coal-based power plants of NTPC. The coal for the power plant is sourced from Lingraj Block & Kaniha coal block of Mahanadi Coalfields Ltd. Source of water for the power plant is from Samal Barrage Reservoir on Brahmani River.

Talcher Kaniha Coal Based Power Station

Address
P.O. Deepshikha (Kaniha)-759 147 Dist. Angul, Orissa

Telephone
(STD-06760) 243252

Fax
232423

Approved capacity
3000 MW

Installed Capacity
Stage I : 1000 MW Stage II : 2000 MW (Under Construction)

Location
Angul, Orissa

Coal Source
Talcher Coal Field Lingraj Block.

Water Source
Samal Barrage Reservoir Samal Barrage Reservoir on river Brahmani

Beneficiary States
Orrisa, Bihar, Sikkim, Assam, Tripura & Damodar Valley Corporation, WB, Jharkhand for Stage I AP, Kerala, Karnataka, TN, Pondichery for Stage II

Approved Investment
Rs.9241.01 Crore

Unit Sizes
6 X 500 MW

Units Commissioned
Stage I
Unit - I : 500 MW February 1995
Unit - II : 500 MW March 1996
Stage II
Unit - III : 500 MW January 2003
Unit - IV : 500 MW October 2003

Unit Commissioned Shedule
Stage II
Unit - V : 500 MW May 2004
Unit - VI : 500 MW February 2005

International Assistance
IBRD French loan


Quick Reply
Your Username: Click here to log in

Message:
Options




All times are GMT +5. The time now is 02:40 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
SEO by vBSEO 3.6.0 PL2

1 2 3 4