How many Hydro Based plants of NTPC are developed in India? Can any one give information about all Hydro based Power Plants of NTPC?
|
#2
31st October 2015, 11:34 AM
| |||
| |||
Re: NTPC Hydro Ltd
There are 5 Hydro Based Power Projects developed by NTPC in India. These are followings: Koldam (HEPP) Rammam Tapovan Vishnugad (HEPP) Lata Tapovan Singrauli CW Discharge(Small Hydro) Koldam Hydro Based Power Project Address P.O. – Barmana, Distirct – Bilaspur, Himachal Pradesh-174013 Telephone (STD Code – 01978) 245061 Fax 245063 Approved Capacity 800 MW Installed Capacity Under Construction Location Bilaspur, Himachal Pradesh Water Source Satluj River Beneficiary States Delhi, Haryana, Punjab, Rajasthan, Uttar Pradesh, Himachal Pradesh, J & K , Chandigarh Approved Investment Rs. 4527.15 Crore Unit Sizes 4X200 MW Units Commissioned Under Construction Tapovan Vishnugad Hydro Based Power Project Address Kagbhusandi Office, Badrinath Road, Joshimath, District Chamoli, Uttarakhand-246443 Telephone (STD Code – 01389) 222192 Fax 222435 Approved Capacity 520 MW Installed Capacity Under Construction Location Chamoli, Uttarakhand Water Source Dhauliganga river Beneficiary States Uttarakhand. Approved Investment Rs. 2978.5 Crore. Unit Sizes 4X130 MW Units Commissioned Under Construction Singrauli CW Discharge(Small Hydro) Address P.O. Shaktinagar-231 222, Dist. Sonebhadra, Uttar Pradesh Telephone (STD-05446) - 232441 Fax 232432 Approved Capacity 2000MW Installed Capacity 2000 MW Location Sonebhadra, Uttar Pradesh Water Source Rihand Reservoir Coal Source Jayant/Bina Mines Beneficiary States Uttar Pradesh, Uttranchal ,Rajasthan, Punjab, Haryana, Delhi and Jammu & Kashmir, Himachal Pradesh, Chandigarh Approved Investment Rs. 1190.69 Crore Unit Sizes Stage - I: 5x 200 MW Stage -II: 2x 500 MW Units Commissioned Unit -I 200 MW February 1982 Unit -II 200 MW November 1982 Unit -III 200 MW March 1983 Unit -IV 200 MW November 1983 Unit -V 200 MW February 1984 Unit -VI 500 MW December 1986 Unit -VII 500 MW November 1987 International Assistance IDA KWF RAMMAM Hydro Based Power Project Location Approx 150 Km from Bagdogra / Siliguri in Distt. Darjeeling. The Darjeeling town is 50 km form the project. Type of Scheme Run of the River Head & Discharge 481.33 & 28 cumecs Diversion structure Barrage with 4 gates bays of 10m each Water Conductor System HRT – 8.2 Km long, 4.00 m dia. D-shaped, with one Adit 800m long. Design Discharge – 28 cumecs Surge shaft Restricted orifice type. Diameter : 14.5m Height : 52.5 Pressure Shaft/Penstock Length 1520 - 1 No. Diameter:2.5m Steel Power House Surface (3 x 40 MW) Type of Turbine Pelton Tail Race Cut and cover box section. 740m long, size: 4m x 3m Land requirement Govt. land : 17 Ha Pvt. Land : 49 Ha Annual Generation (90% Dep. Yr.) 476 MU |
|