2023 2024 Student Forum > Management Forum > Main Forum

 
  #1  
7th June 2017, 01:46 PM
Unregistered
Guest
 
Koldam Hydro Power Project Bilaspur

I am studying in class 12th of CBSE Board. I want to make project on Koldam Hydro Power Project Bilaspur. So is there anybody who will provide information about Koldam Hydro Power Project Bilaspur to make project?

Last edited by Rajkumar Agarwal; 7th June 2017 at 02:05 PM.
Similar Threads
Thread
Bilaspur University Bilaspur Exam Time Table
Koldam hydro power project NTPC
NTPC Koldam
Odisha Hydro Power Corporation Ltd Admit Card
Orissa Hydro Power Corporation 101 Engineer Vacancies
IIT Madras Hydro
Thdc Hydro
THDC Hydro College
KSK Power Project Akaltara
NTPC BHEL Power Project Recruitment
Hydro Power Plant By NTPC
Bilaspur Vishwavidyalaya Bilaspur C G India
Koldam hydro power project
IITB Hydro
Koldam Hydro Power Project NTPC Jobs
NTPC Hydro Ltd
NTPC Koldam Hp
IIT Roorkee Hydro
Hydro IIT Madras
Manitoba Hydro
  #2  
7th June 2017, 02:06 PM
Super Moderator
 
Join Date: Mar 2013
Re: Koldam Hydro Power Project Bilaspur

As you are looking for information about Koldam Hydro Power Project Bilaspur, so here I am telling you about it:

Koldam Hydro Power Project Bilaspur

The Koldam Dam Hydropower Project commonly known as KolDam.

The Construction for this Dam was begun in 2000 and it was opened in 2005.


It is 18 km from Bilaspur off the Chandigarh-Manali Highway (NH-21) near Barmana, Himachal Pradesh.

The dam was constructed by National Thermal Power Corporation (NTPC).

Power Generation Capacity

Unit Number Capacity (MW) Date of Commissioning Status
1 200 2015 Mar commissioned
2 200 2015 April commissioned
3 200 2015 April commissioned
4 200 2015 June commissioned
TOTAL 800



Address
P.O. – Barmana, Distirct – Bilaspur, Himachal Pradesh-174013

Telephone
(STD Code – 01978) 245061

Fax
245063

Approved Capacity
800 MW

Installed Capacity
800 MW

Location
Bilaspur, Himachal Pradesh

Water Source
Satluj River

Beneficiary States
Delhi, Haryana, Punjab, Rajasthan, Uttar Pradesh, Himachal Pradesh, J & K , Chandigarh

Approved Investment
Rs. 4527.15 Crore

Unit Sizes
4X200 MW

Units Commissioned
All Four Units Commissioned

Last edited by Rajkumar Agarwal; 7th June 2017 at 02:28 PM.


Quick Reply
Your Username: Click here to log in

Message:
Options

Thread Tools Search this Thread



All times are GMT +5. The time now is 04:41 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
SEO by vBSEO 3.6.0 PL2

1 2 3 4