#1
9th August 2016, 11:30 AM
| |||
| |||
HPCL Palanpur
Hi I want some details about the HPCL report on the Rapid Environmental Impact Assessment and environmental management plan for the Palanpur???
|
#2
9th August 2016, 01:09 PM
| |||
| |||
Re: HPCL Palanpur
Well below I have given you the HPCL report on the Rapid Environmental Impact Assessment and environmental management plan for the Palanpur Contents Chapter No. Contents Page No. Contents (i-v) List of Tables (vi) List of Figures (vii) Executive Summary 1-13 1.0 INTRODUCTION AND BACKGROUND 1.1 Introduction 1 1.2 Justification of the Project 1 1.3 Objective the EIA Study 2 1.4 EIA Methodology 2 1.4.1 Approach of the EIA Study 2 1.4.2 Establishing Baseline Environmental Scenario 3 1.4.2.1 Secondary Data Collection 4 1.4.2.2 Field Study/Survey/Monitoring 5 1.4.3 Study of Project Data/Activities 6 1.4.4 Assessment of Environmental Impacts 6 1.4.5 Environmental Management Plan 6 1.5 Scope of the Project 7 1.6 Structure of the Project 7 2.0 PROJECT DESCRIPTION 2.1 Project Highlights 8 2.2 Pipelines and Stations 10 2.2.1 Salient Features of the Main Pipeline 10 2.2.2 Pipeline Route Description 12 2.2.3 Summary of Pipeline Details 12 2.2.4 Geographical Location of Terminal 14 HPCL report on the Rapid Environmental Impact Assessment and environmental management plan for the Palanpur |
|