2023 2024 Student Forum > Management Forum > Main Forum

 
  #2  
26th November 2014, 09:30 AM
Super Moderator
 
Join Date: Apr 2013
Re: HP Procurve Training Courses

HP ProCurve training Course Objectives : Course will give you description of:

Install HP ProCurve switches.
Use the command line interface and the web based interface to manage HP ProCurve switches.
Configure and troubleshoot HP ProCurve switches.
Perform software upgrades and maintain configurations using TFTP.

Duration: 2 days

Course Contents: Course includes following topics.

Introduction
Traditional Ethernet, Hubs, Frames, MAC addresses.
Hands on: Building a network with a hub


What is a switch?
Switches versus hubs, the MAC address table, handling unknown addresses.
Hands on: Building a network with HP switches.

Configuration methods
How to configure a HP switch using: Console port access menus, CLI, telnet, web based access.
Hands on: Console access, show commands, using the menus, IP address configuration, telnet.


Command Line Interface
Operator mode, Manager mode, configuration mode, passwords, online help, CLI commands, basic troubleshooting.
Hands on: More show commands, basic troubleshooting, setting a password, displaying status and counters.

Web based interface
Web access, basic format, Getting started. SSL.
Hands on: Web based configuration.


Port configuration
Common port configuration tasks, port security, port aggregation.
Hands on: Configuring ports. Trunking and failover.

STP configuration
Broadcast storms. What is STP? RSTP. Configuring STP.
Hands on: Enabling and disabling STP, investigation failover.


VLAN configuration
What are VLANS? 802.1Q, tagged/untagged, creating VLANS, applying VLANS. Addressing and VLANs, Layer 3 switches and VLANs.
Hands on: Setting up VLANS, setting up tagged ports, Inter VLAN traffic.

Housekeeping
TFTP, software upgrades, downloading configurations.
Hands on: Software upgrade, downloading a configuration.


SNMP
SNMP configuration, HP OpenView.
Hands on: Using SNMP to manage a HP ProCurve switch.

Basic troubleshooting
Putting it all together. Layer 1 troubleshooting, Layer 2 troubleshooting.

Cost: £1067 (plus 20% VAT)


Quick Reply
Your Username: Click here to log in

Message:
Options




All times are GMT +5. The time now is 04:27 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
SEO by vBSEO 3.6.0 PL2

1 2 3 4