Drdo bmd - 2018 2019 Student Forum
 

Go Back   2018 2019 Student Forum > Management Forum > Main Forum



 
Thread Tools
  #1  
Old 17th May 2016, 04:56 PM
Unregistered
Guest
 
Posts: n/a
Default Drdo bmd

Hi I would like to have information about the Indian Ballistic Missile Defence Program as well as the progression on the project by DRDO?
Reply With Quote Quick reply to this message

  #2  
Old 17th May 2016, 06:02 PM
Super Moderator
 
Join Date: Aug 2012
Posts: 15,188
Default Re: Drdo bmd

The Indian Ballistic Missile Defence Program is an activity to create and send a multi-layered ballistic rocket guard framework to shield from ballistic rocket assaults.

Presented in light of the ballistic rocket danger from Pakistan and China, The Indian Defence Research and Development Organization (DRDO) is building up a two-level Ballistic Missile Defence (BMD) framework that comprises of two interceptor rockets, to be specific the Prithvi Air Defence (PAD) rocket for high height interference, and the Advanced Air Defence (AAD) Missile for lower elevation block attempt.

DRDO PAD/AAD Ballistic Missile Defence System Development stage

India started the advancement of the ballistic rocket barrier framework in 1998. The advancement was arranged in two stages. The main stage was trying because of the mind boggling innovations and indigenous mission frameworks utilized in the mission. It is 10 m tall and weighs around 5.2 tons and has distance across of 1m.

Following eight years of improvement, the primary rocket test was directed in November 2006. The Prithvi-II rocket was effectively captured by the PAD in the endo-air at a height of 48km.In December 2007, AAD rocket let go from Wheeler Island caught a reproduced electronic rocket at an elevation of 15km over the Bay of Bengal. The third test was effectively directed in March 2009.

The fourth test arranged in March 2010 was ended because of specialized issues. DRDO test terminated the AAD rocket from the Integrated Test Range (ITR) at Wheeler Island in July 2010.

DRDO arrangements to create two new ballistic rockets, in particular AD-1 and AD-2, in stage 2 of the rocket shield advancement. The AD-1 and AD-2 interceptors can connect with middle of the road range ballistic rockets (IRBMs)/intercontinental ballistic rockets (ICBMs).
Reply With Quote Quick reply to this message
Sponsored Links






















Reply

Similar Threads
Thread Thread Starter Forum Replies Last Post
DRDO after MCA Unregistered Main Forum 1 17th May 2016 11:21 AM
DRDO Result Oct Unregistered Main Forum 1 14th May 2016 01:10 PM
DRDO SET Exam Unregistered Main Forum 1 13th May 2016 04:43 PM
Brahmos DRDO Unregistered Main Forum 1 13th May 2016 04:26 PM
Mysore DRDO Unregistered Main Forum 1 13th May 2016 10:15 AM
DRDO Recruitment For B.Sc Unregistered Main Forum 1 11th May 2016 12:16 PM
Age Limit For DRDO Unregistered Main Forum 1 10th May 2016 09:40 AM
Projects On DRDO Unregistered Main Forum 1 10th May 2016 09:23 AM
Drdo ficci Unregistered Main Forum 1 6th May 2016 03:42 PM
DRDO Jagdalpur Unregistered Main Forum 1 6th May 2016 03:21 PM
DRDO ECE Syllabus Unregistered Main Forum 1 6th May 2016 12:50 PM
Vacancy in DRDO Unregistered Main Forum 1 5th May 2016 03:46 PM
DRDO Exam Fee Unregistered Main Forum 2 20th February 2016 04:54 PM
Drdo mba Unregistered Entrance Exams 1 18th December 2015 04:08 PM
How to Get Job in DRDO Unregistered Main Forum 3 14th December 2015 11:09 AM
SET DRDO Exam Unregistered Main Forum 1 16th June 2015 04:16 PM
DRDO ECE Syllabus Unregistered Main Forum 1 19th November 2014 04:51 PM
Eligibility for DRDO Unregistered Main Forum 1 14th November 2014 11:54 AM
Jobs for CSE in DRDO Unregistered Main Forum 1 10th November 2014 11:40 AM
DRDO training for ECE Unregistered Main Forum 1 6th November 2014 08:15 AM


Quick Reply
Your Username: Click here to log in

Message:
Options

Thread Tools Search this Thread



All times are GMT +5.5. The time now is 02:33 AM.


Powered by vBulletin® Version 3.8.8
Copyright ©2000 - 2018, vBulletin Solutions, Inc.
SEO by vBSEO 3.6.0 PL2

1 2 3