CIDCO Water Cut

Hi buddy I heard City and Industrial Development Corporation of Maharashtra (CIDCO) has published notice in November 2015 for 20% water cut, can you tell me from where I can see that notification for get info about reason behind it ?
Similar Threads
Thread
Online CIDCO Water Bill
DTU Urban Water Engineering
Ionization of HCL in Water
Water In India
Causes of Water Shortage
Solutions to Water Scarcity
MPSC Water
Mineral Water Dealers
Water Purifier Manufacturers
What Is The Water Cycle
Causes For Water Scarcity
Solutions to Water Problems
Water Park In Mumbai
Water Delivery St Louis
Water Delivery Cincinnati
Water Delivery Houston
Water Delivery Chicago
Water delivery DC
CIDCO Water Department
HSIIDC water
  #2  
10th April 2016, 02:15 PM
Super Moderator
 
Join Date: May 2012
Re: CIDCO Water Cut

Yes City and Industrial Development Corporation of Maharashtra (CIDCO) has published notice in November 2015 for 20% water cut, as are looking for reason behind it so I am telling that in light of less rainfall this year in the catchment areas of Morbe Dam (NMMC), Barvi Dam of Maharashtra Industrial Development Corporation (MIDC), Patalganaga Water Supply Scheme of Maharashtra Jeevan Pradhikaran (MJP) and augmentation of 1200 mm dia MS Pipeline to 1500 mm from Hetawane Dam to Water Treatment Plant, Jite, Tal. Pen, they have observed a short supply of 33 MLD with respect to the present demand of 216 MLD due to Water Cut by NMMC, MIDC & MJP. Therefore CIDCO has no option but to declare 20% water cut w.e.f 06.11.2015 .

In order to improve the situation, City and Industrial Development Corporation of Maharashtra (CIDCO) is taking the following measures:
1. Immediate measures taken up by City and Industrial Development Corporation of Maharashtra (CIDCO):
• Additional 3 MLD of water is requested from MIDC (expected in two
months.
• The work of augmentation of raw water pumps at Hetawane Water
Treatment Plant is taken up (Expected extra supply 15 MLD, expected
completion in May 2016).

2. Short Term Measures :
• City and Industrial Development Corporation of Maharashtra (CIDCO) has sought additional water supply of 35 MLD over and above
the present 85 MLD from the MJP Patalganga Water Supply Scheme
which is under augmentation by MJP and it is expected to be available
by December 2016.

• The work of augmentation of 1200 mm MS pipeline to 1500 mm dia.
MS line between Hetawane Dam and CIDCO’s Water Treatment Plant
at Jite, Tal. Pen. (Expected completion May 2017, additional water
expected 35 MLD ).

• City and Industrial Development Corporation of Maharashtra (CIDCO) requested GoM and MIDC for additional quota of 100 MLD
from MIDC’s Barvi Dam which is expected to be available by
December 2016.

• City and Industrial Development Corporation of Maharashtra (CIDCO) is planning to provide recycled water available from its various
sewage treatment plants which can be utilized for various purposes
other than drinking. The work will be taken up shortly and completed
by December 2016 (Additional water expected 20 MLD)

CIDCO Water Cut info notification








Tags
short term

Quick Reply
Your Username: Click here to log in

Message:
Options




All times are GMT +5. The time now is 02:13 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
SEO by vBSEO 3.6.0 PL2

1 2 3 4