Andhra Pradesh Power Generation Corporation Limited is one of the critical associations of Andhra Pradesh, occupied with the matter of Power era. Aside from operation and Maintenance of the force plants it has attempted the execution of the continuous and new power ventures booked under limit expansion program and is taking up remodel and modernization works of the old force stations.

The details of the lists of tenders which had been issues and published on the official website of Andhra Pradesh Power Generation Corporation Limited are as follows:

1 CEG/E4A1/Sulphuric Acid/81/2015-16
Supply of 2100 MT of Sulphuric Acid (Technical Grade 98-99 % by weight naked),Conforming to IS–266-1993 or its latest versions to Dr.NTTPS “ IV Stage and RTPP of APGENCO for the year 2016-17.
Corrigendum
11/04/2016 04:00:00 PM
O/o.The Chief Engineer/Generation/APGENCO/Vidyut Soudha/Hyderabad

2 CEG/E4A1/SDSTPS/Polyelectrolyte/91/2015-16
Supply of 6.5 MT of Polyelectrolyte (Anionic Flocculant), Packed in 25 Kg Polythene bags with inner cover to SDSTPS for the period up to 31.03.2017.
--
12/04/2016 03:00:00 PM
O/o.The Chief Engineer/Generation/APGENCO/Vidyut Soudha/Hyderabad

3 NIT No.03/CE/Civil/Hydel/GS and C&I/APGENCO/2015-16
Shifting of APGENCO Administration office from Hyderabad to Vijayawada-Hiring of office space.
Corrigendum
16/04/2016 04:00:00 PM
CE/C/Hydel, GS and C&I/Vidyut soudha/Hyd.

4 e-22/CE/C/Hydel, GS and C&I/APGENCO/2015-16
Sale of fly ash from Dr. NTTPS through e-procurement platform
--
16/04/2016 05:00:00 PM
CE/C/Hydel, GS and C&I/Vidyut soudha/Hyd.

5 e-CEG/SEG-III/E3A1/SDSTPS/CHP/92/2015-16
Operation & Mechanical Maintenance, Electrical, C & I Works, Upkeeping, Ventilation and illumination works of Complete Coal Handling System of Unit I & II of SDSTPS including T&P and consumables for a period of 11 months i.e from 01.05.16 or from the date of commencement of orders to 31.03.2017
--
18/04/2016 03:00:00 PM
SE(Generation - III)/APGENCO/Vidyut Soudha/Hyderabad-82

6 PCH-20/2015
as per the tender specification.
Corrigendum
19/04/2016 03:00:00 PM
Chief Engineer, TB Board, Vidyut soudha, Hyderabad.

7 CEG/E4A1/SDSTPS/Hydrochloric Acid/93/2015-16
Supply of 1130 MT of Hydrochloric Acid, 30-33%, Technical Grade, Conforming to IS-265-1993 (Reaffirmed 1995) or its latest versions to Sri Damodaram Sanjeevaiah Thermal Power Station (SDSTPS) for the period up to 31.03.2017.
--
22/04/2016 03:00:00 PM
O/o.The Chief Engineer/Generation/APGENCO/Vidyut Soudha/Hyderabad

8 E-23/HPC&HP/APGENCO/2016
Design, manufacture, Shop testing, inspection, supply, delivery at site of LT switchgear panels consisting of 415V, 3phase, 4wire Station Auxiliary Board (1No.) & 220V DC Distribution Board (1No.) for Machkund Hydro Electric scheme
--
03/05/2016 05:00:00 PM
CHIEF ENGINEER, HPC & HYDEL PROJECTS, APGENCO, VIDYUT SOUDHA, HYDERABAD.

9 e-22/HPC&HP/APGENCO/2016
Engineering, Procurement and Construction (EPC)contract for 7 to 10MW capacity wind power project at Ramagiri, Anantapuramu District, Andhra Pradesh with its comprehensive operation & maintenance for 10 years
Corrigendum
17/05/2016 05:00:00 PM
Chief Engineer/HPC&HP/APGENCO/Vidyut Soudha/Hyderabad


Quick Reply
Your Username: Click here to log in

Message:
Options

Thread Tools Search this Thread



All times are GMT +5. The time now is 03:49 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
SEO by vBSEO 3.6.0 PL2

1 2 3 4